Friday, 1 November 2013

Media Timings

9:00 – Get to the location and start to unpack the equipment as fast and efficiently as possible.

10:00  - Start filming, start by doing drum close ups.

10:30 – Start on bass close ups, this will include drums and possibly guitar in the background.

11:00 – Start on Guitar close ups, this will include drums and possibly bass in the background.

11:30 – Start full band shots, this will have everyone in.

12:30/13:00 – Once packed all the barn equipment away we must now start on the narrative, shots in the fields and the woods.

17:00 – We should be finished by this time if all times are met and stayed to.

No comments:

Post a Comment